Our Latest Projects That We Have Completed

Maizey Plastics—Pinetown

Alterations and repairs as well as structural steel installation — installation of beams—support existing upper concrete slab.

Posted in Post, Project | Comments Off on Maizey Plastics—Pinetown

LCS—Bayshipping

We were appointed to do an upgrade on the Depot, this included all Civil works, refurbishment of existing building – where there were rust damage, installation of palisades and entry and exit gates.  Supply and install 18m Light Masts, additional concrete

Posted in Post, Project | Comments Off on LCS—Bayshipping

KIMPE—SA

Structural Steelwork  Structure 34mx24mx13m erected at Kimpe SA Roodekop, for the new milling plant —with roller shutter doors as well as roof top. Including all civils works — foundations and floors.   

Posted in Post, Project | Comments Off on KIMPE—SA

Engen Annlin

Canopy Structural Steel and Covering for new Engen Service Station at Annlin Shopping Centre—Pretoria

Posted in Post, Project | Comments Off on Engen Annlin

Rodney Houston-McMillan Hangar — Heidelberg Airfield

Elpee’s Steelworks took on the responsibility for the Design, Fabrication, Erection and Roof sheeting, as well as all civil and building works.  Elpee’s Steelworks installed a new hangar door which is fully operational with hydraulic cylinders.

Posted in Post, Project | Comments Off on Rodney Houston-McMillan Hangar — Heidelberg Airfield

WEG Lift Good Hoist

Elpee’s Steelworks did the design on the goods hoist lift structure as well as the access to the lift, this project was a mere 5.7 Ton in steel

Posted in Post, Project | Comments Off on WEG Lift Good Hoist

LTD Transport—Pomona

Elpee’s Steelworks took on the responsibility for the design, fabrication, erection, rain water draining system and roof sheeting on this project until completion. Our client have a fleet of 104 Trucks—this facility was erected as a truck wash facility, fully

Posted in Post, Project | Comments Off on LTD Transport—Pomona

The Leonardo—Sandton

The Leonardo is a 55-floor mixed-use property development in Sandton, Johannesburg, South Africa that stands at a height of 234 metres (768 ft), 11 metres (36 ft) taller than the third tallest building in Africa, the Carlton Centre.  Elpee’s Steelworks were privileged to install 80 Ton, on hand

Posted in Post, Project | Comments Off on The Leonardo—Sandton

Eldacc Warehouse—Germiston

Elpee’s Steelworks were responsible for the workshop detailing, fabrication and erection as well as the supply and installation of roof sheeting.  This warehouse building consists of 9400m² of structural steel, 378 tons of steel and 17 000m² roof sheeting.  This

Posted in Post, Project | Comments Off on Eldacc Warehouse—Germiston

Karan Beef Feedlot

This is a storage facility to sort all incoming cattle.  The storage facility consist of two (x2) stores measuring 20m x 5.8m x 245m.

Posted in Post, Project | Comments Off on Karan Beef Feedlot

Goldfield Mine

Structures that was fabricated and transported to Goldfield Twin Shaft Mine  

Posted in Project | Tagged | Comments Off on Goldfield Mine

MSC Depot – Roslyn

We manufactured and erected the depot structure for MSC in Rosslyn Pretoria

Posted in Project | Tagged | Comments Off on MSC Depot – Roslyn

Lyncon Construction Warehouse – Germiston

Elpee’s  Steelworks completed a steel structure warehouse of 6800 m² (117 tons) for Lyncon Construction in the newly developed Raceway Industrial Park in Germiston.   Structure under construction Completed Warehouse

Posted in Project | Tagged | Comments Off on Lyncon Construction Warehouse – Germiston

Raceway Industrial Park – Germiston

The architectural entrance was manufactured and erected at Raceway Industrial Park in Germiston  

Posted in Project | Tagged | Comments Off on Raceway Industrial Park – Germiston

SAB – Centurion

The light carport structure was done for SAB-Centurion.

Posted in Project | Tagged | Comments Off on SAB – Centurion

Probuild Warehouse – Midrand

The warehouse was fabricated and erected for Probuild Construction group in Midrand consisting of a total of 95 tons steel.

Posted in Project | Tagged | Comments Off on Probuild Warehouse – Midrand

JCP Steel – Nigel

The structure was for a factory in Nigel for JCP Steel suppliers. Elpee’s was responsible for all work including the civil work, building work and the 200 mm thick concrete floor. A total of 95 Tons was fabricated and erected

Posted in Project | Tagged | Comments Off on JCP Steel – Nigel

Sublime Technologies – Kriel

In November 2012 Elpees was successful in winning an open tender for a 84 ton steel structure for the manufacturing of Maro grid material. The structure was manufactured and erected for Sublime Technologies – Kriel. The complete structure were  galvanized

Posted in Project | Tagged | Comments Off on Sublime Technologies – Kriel

Blinkwater Mills – Stoffberg

From February 2011 until December 2011 Elpee’s Steelwork manufactured and erected a 205 ton steel structure for Bilkwater Mills in Stoffberg. Manufacturing took place at our factory and was then transported to site, erected and closed with chromadeck sheeting on

Posted in Project | Tagged | Comments Off on Blinkwater Mills – Stoffberg